Moving

Advertisements
Image | Posted on by | 3 Comments

The books are coming!

The books are coming!

Image | Posted on by | Leave a comment

Last friday

Bench and storage in the copyroom completed.

Sanded and painted all movable furnitures.

Major clean up, preparing for moving the books on tuesday.

Added a new magazine shelf with envelope/reading table on top.

 IMG_1224 IMG_1226

Posted in Inspiration | Leave a comment

More photos!

IMG_1223 IMG_1222 IMG_1217

Posted in Inspiration | Leave a comment

The ruler of the room

The librarians workspace is taking shape. There is now a desk by the window with a lower part for book returns or book stacks. One mobile unit expanding the lower working area and one taller mobile unit for working standing. Both mobile units have display stands in front for magazines or books.

Image

Image

Posted in Inspiration | Tagged , , , , , | 1 Comment

Concrete table

The concrete table was finished today! We made the legs from plywood yesterday and welded a frame and placed the concrete slab on it today. It went smoother and faster than we expected!

Image

Moving the 450kg concrete slab around was a tricky task and a custom jig was created.

IMG_1927

Steel frame mounted to wooden legs

IMG_1934

IMG_1930

IMG_1929

Try it out!

Posted in Inspiration | Tagged , , , | 2 Comments

The work has resumed

The work has resumed

We`re back on track and have already casted the floor of the entrance and mounted the first desk. The work will last until 8th of july, and hopefully everything is in tip-top shape for the diploma party in august!

Image | Posted on by | Leave a comment